- Hem
- Böcker
- Facklitteratur
- Fordon
- The Cambridge to King's Lynn Line (häftad, eng)
The Cambridge to King's Lynn Line (häftad, eng)
Winter 1984/5 – the future for the Cambridge–King’s Lynn ‘Fen Line’ looked bleak. British Rail had singled long track sections. There had be...
229 kr
Bara 3 kvar
Skickas inom 2-3 vardagar
Fri frakt över 299:-
Snabb leverans
Fria returer
Produktbeskrivning
Winter 1984/5 – the future for the Cambridge–King’s Lynn ‘Fen Line’ looked bleak. British Rail had singled long track sections. There had been closure talk.Yet, following a vigorous three year political and technical campaign, government approval for its electrification was granted in February 1989.
Construction work was drawn out and suffered setbacks, so it wasn’t until August 1992 that electric trains finally started operating on the 41-mile-long line. At first passengers were fairly thin on the ground, but as the years progressed growth (fuelled by commuting into Cambridge and, to a lesser extent, London) meant trains gradually became very overcrowded.
Extensive works to upgrade the line to take longer trains have now come on stream. As well as a new Cambridge North, there are well-developed plans for other new stations.Concentrating mainly north of Cambridge, this book illustrates the trains that run from Kings Cross and Liverpool Street to Ely and King’s Lynn via Cambridge, many of the types and liveries seen, and the extensive infrastructure works that have taken place over the last thirty-or-so years.Mike Beckett was a strategic planner at King’s Lynn & West Norfolk Borough Council at the time of the electrification campaign.
With a personal as well as professional interest in transport, he maintains a photographic record of the line’s many changes and has drawn on his collection to produce this book.
Construction work was drawn out and suffered setbacks, so it wasn’t until August 1992 that electric trains finally started operating on the 41-mile-long line. At first passengers were fairly thin on the ground, but as the years progressed growth (fuelled by commuting into Cambridge and, to a lesser extent, London) meant trains gradually became very overcrowded.
Extensive works to upgrade the line to take longer trains have now come on stream. As well as a new Cambridge North, there are well-developed plans for other new stations.Concentrating mainly north of Cambridge, this book illustrates the trains that run from Kings Cross and Liverpool Street to Ely and King’s Lynn via Cambridge, many of the types and liveries seen, and the extensive infrastructure works that have taken place over the last thirty-or-so years.Mike Beckett was a strategic planner at King’s Lynn & West Norfolk Borough Council at the time of the electrification campaign.
With a personal as well as professional interest in transport, he maintains a photographic record of the line’s many changes and has drawn on his collection to produce this book.
Format | Häftad |
Omfång | 96 sidor |
Språk | Engelska |
Förlag | Amberley Publishing |
Utgivningsdatum | 2023-08-15 |
ISBN | 9781398115583 |
Specifikation
Böcker
- Häftad, 96, Engelska, Amberley Publishing, 2023-08-15, 9781398115583
Leverans
Vi erbjuder flera smidiga leveransalternativ beroende på ditt postnummer, såsom Budbee Box, Early Bird, Instabox och DB Schenker. Vid köp över 299 kr är leveransen kostnadsfri, annars tillkommer en fraktavgift från 29 kr. Välj det alternativ som passar dig bäst för en bekväm leverans.
Betalning
Du kan betala tryggt och enkelt via Avarda med flera alternativ: Swish för snabb betalning, kortbetalning med VISA eller MasterCard, faktura med 30 dagars betalningstid, eller konto för flexibel delbetalning.
Specifikation
Böcker
- Format Häftad
- Antal sidor 96
- Språk Engelska
- Förlag Amberley Publishing
- Utgivningsdatum 2023-08-15
- ISBN 9781398115583